Category
LNG Pump LNG Regasfication Equipment LNG Dewar Filling Pump Skid
LNG Pump LNG Regasfication Equipment LNG Dewar Filling Pump Skid cryogenic liquid oxygen nitrogen argon co2 lng pump wor
Basic Info
Model NO. | SMC-600-900/200 |
Specification | SMC-1500L/H |
Trademark | SMC |
Origin | China |
HS Code | 8413810090 |
Production Capacity | 20set Per Year |
Product Description
LNG Pump LNG Regasfication Equipment LNG Dewar Filling Pump Skidcryogenic liquid oxygen nitrogen argon co2 lng pump workshopLNG LCNG Refueling Station: 25Mpa LNG Transer Pump Skid
One. Introduction1.1The medium used in this process system:Liquefied Natural Gas(LNG) Design Temperature:-196ºC Working Pressure: before submersible pump ≤1.6MPa, after pump≤2.0MPa; L-CNG high pressure pump before≤1.6MPa, after pump≤25MPa;
1.2 Physical Parameters of LNG:Average Molecular Weight:17.3Main Components:methane(CH4)~ 93.6 %,Ethane(C2H6)~4.12 %Vaporization Temperature: -162.3ºC(atmospheric pressure)Liquid Density:~426 kg/m3 Gas Density:0.772 kg/Nm3 (15.5 ºC) Gas/Liquid Volume Ratio:~625:1(15.5 ºC)Ignition Point:650 ºCRemarks:As the LNG varies from place to place, the physical property parameters must be based on the LNG supplier's.
Two.LNG/L-CNG Filling Station Process Flowchart
- Unloading Process: Transfer LNG(liquid natural gas) from the tank truck to the LNG storage tank of the gas station through the LNG submersible pump skid(including the unloading truck and the tank booster) at the gas filling station.
- Pressurization Process: After unloading, the LNG is pressurized to above 23Mpa by the LNG high pressure pump skid, and then gasified into CNG(high pressure natural gas)by the high pressure vaporizer skid(including high pressure vaporizer, high pressure water bath electric heating reheater, and sequence control panel), and enter the high pressure gas cylinder group for storage.
- Gas Filling Process: When the pressure in the high pressure gas cylinder group is too low to be able to refill normally, the high pressure pump restarts and vaporizes to replenish and pressurize the high pressure gas cylinder group, and refill the car.
- Liquid Filling Process: LNG is pressurized to about 1.6Mpa by the LNG submersible pump skid, and LNG is filled into the car bottle group through the pipeline and LNG dispenser.
LNG/L-CNG Refuel Gas Station Equipment: L-CNG High Pressure Vaporizer Skid
LNG/L-CNG Refuel Gas Station Equipment: LNG Submerged Pump Skid LNG/L-CNG Refuel Gas Station Control System LNG Dispenser Technical Specification
Item | Specification |
Flow Range | 3-80kg/min |
Max Working Pressure | 1.6MPa |
Working Temperature | -30-+55ºC |
Inlet Flow Meter Type | 1" low temp mass flow meter E+H/Emerson |
Measurement Accuracy | ±1% |
Minimum Reading Graduation Value | 0.01kg or Nm3,L |
Single Measurement Range | 0-9999.99kg(or Nm3,L) |
Cumulative Measurement Range | 0-99999999.99kg(or Nm3,L) |
Filling Hose | 1" stainless steel soft pipe 4m |
Return Air Hose | 1/2" stainless steel soft pipe 4m |
Networking Interface | RS485(use photoelectric isolation 8KV ESD) |
Electrostatic Discharge Immunity | 4class 8KV |
Electrical Fast Transient Pulse Group Immunity | 4 class 4KV |
Surge Immunity | 4 class 4KV |
Power Supply | AC220V<200W |
Explosion-proof Grade | ExdibellBT 4Gb |
Weight | About 325kg |
LNG/L-CNG Refuel Gas Station Testing:
Welcome all the foreign customers come to visit our factory and LNG/L-CNG Gas Refueling Station Working Site.Thanks.