Modular Gas Processing Plant with Acid Gas Treatment and Dehydration Unit

Modular Gas Processing Plant with Acid Gas Treatment and Dehydration Unit

Overview About Us Greenfir is a professional natural gas processing & liquefaction plant, air separation unit, heat exch
Basic Info
Model NO. MGP
LNG Output 2tph, 3tph, 5tph
Turndown Ratio 65%~110%
Process Selection S-Mrc, D-Mrc, Propane-Mrc
Gas Purification Yes
Transport Package Seaworthy Packing
Specification As required
Trademark Greenfir
Origin China
HS Code 8421399090
Production Capacity 30 Sets/ Year
Product Description
About Us

Greenfir is a professional natural gas processing & liquefaction plant, air separation unit, heat exchanger, reciprocating piston compressor, cryogenic cold box, fractionating column manufacturer and solutions provider with ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018 and ASME U certified.
We offer skid-mounted solutions optimized for each specific project, covering the following applications: Air Separation Plant, LNG Plant, Gas Purification & Liquefaction Unit, CNG/ LNG/ L-CNG Filling Station, Flare Gas Recovery Unit and Hydrogen Purification Unit, etc. We can deliver skid-mounted solutions customized to meet client's challenges and requirements (including adverse weather conditions, transportation and plot area limitations, etc).
We treat all the cryogenic solutions with serious attitudes and professional experience. Combined with our knowledge and experience, Greenfir provides each client with a technology-leading solution you can count on and bring a wider range of options and more profits.

Product DescriptionTo Meet Demand, Gas Processors Need the Right Solution

Much of the world's gas reserves are located in remote, hard-to-reach
locations, requiring solutions that can be applied in varying conditions.
Meanwhile, gas developers need to be able to predict and control capital
spending, while maximizing the value of their natural gas and natural gas
liquids (NGLs). The solution: modular equipment.

Modular Equipment -The Solution for Gas Processing

Greenfir provides solutions for your gas processing project, including shop
fabrication, construction management, startup, and operations. We
offer a range of solutions to best meet your gas processing needs - from
straightforward dew pointing operations, to maximum NGL recovery.

Modular Design for Reduced Costs and Predictable Timelines

Our modular gas processing plants are factory-built using a unique design
and construction approach that allows for quick fabrication and superior
quality control. Due to pre-fabricated construction, your plant can be
shipped by truck - even to remote locations. Upon delivery to a prepared
worksite, the equipment is ready to install. Modules are designed to fit
together rapidly, significantly reducing site construction time, expense and
associated delays.
The following modular gas processing plant components are available from Greenfir, Process Technology

Greenfir liquefaction technologies are mostly based on the MR (mixed refrigerant) technology. It is designed with a closed loop refrigerant cycle, thereby eliminating make-up or chemical/ logistics handling for the refrigerant. The main elements of the plant are as listed below, while different modules can be incorporated to improve the efficiency of the plant according to the specific project requirements.

Main System
  • Filtering & Metering Skid
  • Gas Purification System (Acid Gas Removal package, Dehydration Package, and Mercury Removal Package)
  • Liquefaction (Cold Box, MR Compressor, etc.)
  • LNG Storage
  • LNG Loading System
  • Utilities (Instrument Air & PSA Nitrogen Generattion Package, Demineralized Water System, Hot Transfer Oil System)
  • Instrumentation Control System
  • Electrical Control System
  • Feed Gas Booster Compressor(s) (Optional)
  • Nitrogen Removal Column (Optional)
  • Heavy Hydrocarbons Separation (Optional)
  • Biol-off Gas Handling (BOG Compressor) (Optional)
  • Power Generation (Optional)
  • etc.
Customer Benefits

- Robust and reliable technology that is simple to operate.- Designed for unmanned operation.- Easy start-up and shut down of all systems.- Quick and easy capacity control.- Compact and modularized design ensures easy shipment and cheaper installation.- The lowest specific power consumption in small size plants.- All components based on conventional parts and proven technology -> Spares can be delivered quickly.- Reliable main rotating machinery with high efficiency.- Local control of LNG export -> truck driver handles the loading.- Fast project delivery time (FOB 7 months for the MRC Process).- Broad range of applications, biogas, pipeline, CBM and associated gas

Our extensive service offerings, coupled with our unmatched technical knowledge and experience, can help you focus on profitability.

Reference List
ProjectScope of SupplyCapacityQuantityLocationYear
Natural Gas Purification, Liquefaction Plant
50,000 Nm3/day Wellhead Gas Recovery ProjectEPC 1ChinaNov. 2016
30,000 Nm3/day Mini LNG PlantEPC 2ChinaMay, 2017
30,000 Nm3/day Wellhead Gas Recovery ProjectEPC 1ChinaMay, 2017
30,000 Nm3/day Mini LNG PlantEPC 1ChinaNov. 2018
50,000 Nm3/day Wellhead Gas Recovery ProjectEPC 1ChinaNov. 2019
60,000 Nm3/day Mini LNG PlantEPC 1ChinaNov. 2018
Demethanizer and Deethanizer Rectification SystemEP20,000 Nm3/day KazakhstanJul. 2020
CNPC 100,000 Nm3/h Mini LNG PlantEPC 2ChinaJan. 2021
ARV 50 TPD Mini LNG Plant ProjectEP, Supervision Commissioning, Start-up50 TPD1IrianApr. 2021
MAN 3.5 MMSCFD Mini LNG Plant ProjectEP, Supervision Commissioning, Start-up3.5 MMSCFD1IrianApr. 2021
50,000 Nm3/day Mini LNG PlantEPC 1ChinaAug. 2021
Ethylene Compressor StationEP, Supervision Commissioning, Start-up17.88 MMSCFD IrianApr. 2022
MAR 20 MMSCFD Amine Sweetening Package ProjectEP, Supervision Commissioning, Start-up20 MMSCFD1IrianDec. 2022
KHE 13 MMSCFD Field Flare Gas Recovery ProjectEP, Supervision Commissioning, Start-up13 MMSCFD1IrianDec. 2022
100,000 Nm3/h Mini LNG PlantEPC 2ChinaDec 2022
Deethanizer Rectification SystemEP30,000 Nm3/day1KazakhstanMar. 2023
220,000 Nm3/day (0.05 MTPA) small-scale LNG plantEPC (in progress) 1China2023
300,000 Nm3/day small-scale LNG plantEPC (in progress) 1China2023
Xinjiang 300,000 Nm3/day small-scale LNG plantEPC (in progress) 1China2023
Location: Qingyang City, Gansu, ChinaFeed gas capacity: 30,000 Nm3/day @ 4 bargPlant turndown ratio: 30~110%Process plant: include amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.Product: LNG = 21 TPD.Location: Qingyang City, Gansu, ChinaFeed gas capacity: 50,000 Nm3/day @ 4 bargPlant turndown ratio: 30~110%Process plant: include feed gas booster compressors (1W+1S), amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.Products: LNG = 25 TPD, LPG = 18 TPD.
Location: Mianyang City, Sichuan, ChinaFeed gas capacity: 240,000 Nm3/day @ 50 barg, appro. 20 °C.Plant turndown ratio: 30~110%Process plant: include gas generator units (2×3.75 mW), amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.Product: LNG = 2×72 TPD.Feed gas capacity: 72,000 Nm3/day @ 30~60 barg, 15~30 °C.Plant turndown ratio: 30~110%Process plant: include amine sweetening package, dehydration package, Hg removal, HHC removal, nitrogen rejection, utilities, LNG truck loading facilities, LNG storage tank (2×500 square meter) etc.Product: LNG = 50 TPD.
Location: Leshan City, Sichuan, ChinaFeed gas capacity: 100,000 Nm3/day @ 100 barg.Plant turndown ratio: 30~110%Process plant: include amine sweetening package, dehydration package, Hg removal, utilities, LNG truck loading facilities, etc.Product: LNG = 72 TPD.Location: Ziyang City, Sichuan, ChinaFeed gas capacity: 60,000 Nm3/day @ 40 barg, 15~30 °C.Plant turndown ratio: 30~110%Process plant: include amine sweetening package, dehydration package, Hg removal, utilities, LNG truck loading facilities, etc.Product: LNG = 42 TPD.
FAQ

Q1. Are you manufacturer or trading company?We are professional manufacturer of multi-components gas purification, separation and liquefaction equipment.Q2. What's your advantage?We provide you not only technology-leading, stable and reliable, cost-efficient equipment, but also solutions and after-sales services.Q3. Have your engineers participated in any foreign projects?Yes, our engineers have more than 20 years experience in our field and have participated in the design, manufacturing, installation and commissioning of the equipment in Turkey, Iran, Egypt, Nigeria, Russia, India, etc.Q4. How can I get the exact price of the product?Please tell us your specific requirements, so we can provide the most suitable products and solutions to you.